Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

It is really helpful to draw a schematic LAN network diagram. Arrange all Vertexes on the design according to the LAN network design rules. Choose .

Create a schematic LAN network diagram. This will help you plan the right number of LAN ports and to divide them between switches. Remember about additional devices, such as the cloud gateway and the connection to the BMS.

...

LAN network design rules:

  1. The maximum distance between devices is 100 m.

  2. To connect BMS, use Modbus TCP/IP.

  3. The LAN switch requires an external power supply.

...

Small LAN network

...

Good practices:

...

  1. .

...

  1. Up to 25 Vertexes can work in one group (cluster). If more Vertexes are required, create more clusters.

  2. One E2D REMOTE ACCESS KIT can be connected to one cluster. If there are more clusters, more devices should be added.

Info

...

Good practices:

  • Do not use all switch ports – always have a spare port in case of system expansion or for service purposes.

If you have two different types of ApCs controllers in your project (Vertex 2 and Vertex 3), below you will find instructions on how to combine them in one system, how to replace the device on site, how they differ, etc.need to follow these instructions:(Classic) Merging Vertex 2 and Vertex 3 within the same cluster /wiki/spaces/ME/pages/1979646009

For more information go to: