This documentation is for older software versions (up to 3.1.29). If you have software version 3.1.30 or higher, go to MODERN Home

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Unmanaged industrial switches are used to expand the LAN network infrastructure. There are two variants of switches: with 5 or 8 ports.

Each switch requires an external power supply:

LMS E2D POWER SUPPLY 24V 30W

How to use it in the LMS design?

While designing remember the LAN guidelines.

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.