This documentation is for older software versions (up to 3.1.29). If you have software version 3.1.30 or higher, go to MODERN Home

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

It is good step to get know with this article first Vertex group & Vertex cluster if you are not familiar with it.

Sometimes may exist the necessity of connecting two different Vertex groups or two different clusters with two different flow into one system. When the common CUID has been set for both groups, it is essential to copy flow from one system and paste it to a second as next tab. Simple example shown below:

First and Second groups are two different systems. On site firstly was commissioned primary lightning system consisted of switching and dimming (Switch flow) . HCl’s control was commissioned later (HCL flow). Now, there is need to link groups into one common system. It is important to copy flow from one of old systems to new (new means two common now). You can do it by exporting flow and importing it as a new tab:

and move it into one tab (this is not obligatory, but estetic if you have small flow)

Now there are two flows linked into one flow for two Vertexes

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.