Before commissioning emergency reports we recomend reading these articles:

...

Emergency Report Access

To Access the Emergency Lighting Report:

  1. Log in to the Dashboard (https://dashboard.liteip.com/).Enter and enter the desired Site ID in the drop down menu [1]

Info

If you do not have the neccessary permissions contact your Sales representative for further support. If they are not available please contact lms.support@glamox.com

...

  1. Select Site Reports [2] → Emergency Lighting Report [3].

...

Emergency Report

...

Summary Page Content:

Page includes:

  • How many luminaires there are in total (emergency and non-emergency).

  • Emergency fittings are broken down into Fault types.

...

Results Page(s) Content:

Page includes:

  • Detailed breakdown by Detailed information shown on drawing, with fault type.

  • Seperate result tables for DALI and Self-Test emergency luminaires.

...

Status Page Content:

Page includes:

  • Summary of the statuses which may be observed in the report.

...

  1. Click the download icon [14] Select and select from a wide range of export files formats.

  2. This will be stored locally to your laptop/PC/mobile.

...

Emergency Reports

Access

To Access the Emergency Lighting Report:

  • Login to the Dashboard and enter the desired post code in the top left of the screen.

...

  • Select Project Reports>Emergency Lighting Report

Report Contents

...

  • First Page - Summary

    • How many fittings there are in total, broken down into emergency and non emergency fittings

    • Emergency fittings are then broken down into Fault Type

  • Middle Pages

    • Provide a detailed breakdown by drawing, with fault type

...

Info

Greyed out fittings are standard luminaires and green luminaire is the emergency luminaire being reported as healthy.

  • Final Page

    • Provides a summary of the statuses which may be observed in the report

...

Exporting

Use the menu at the top of the report to either print, print page or export electronically

...

Energy Reports

Luminaire energy usage can be viewed across the wireless installation

Energy Graph

  • Select Project Reports > Energy Graph

    • This will then give you the option to review 'All Drawings' or a specific drawing and over the period of the last 7 days, 12 weeks or 1 year.

...

  • Once Selected you can review usage

...

  • If 'Unoccupied' settings have been commissioned on your site, this screen will also show this graph

...

Info

For further detail on Building Unoccupied see Application Note - Building Occupied and Unoccupied Mode.

  • This can be exported using the dropdown menu in the top right of the screen

Annual Energy Report

  • Select Project Reports > Annual Energy Report

...

  • First Page - Summary

    • Total number of reporting fittings, their usage and Annual Usage. This will also be equated to £cost if the kwhr has been entered at the commissioning stage

  • Middle Pages

    • Provides a detailed breakdown with colour coding

...

  • Final Page provides a key

...

Exporting

Use the menu at the top of the report to either print, print page or export electronically

...

Report Scheduler

It is possible to schedule both the Emergency Report and Annual Energy Report to be sent to nominated email addresses.

Annual Energy Report and Emergency Report

  • Select Project Reports > Report Scheduler and then either Emergency Lighting Report or Annual Energy Report

...

  • Enable the report and select the frequency of receipt

...

  • Enter the required email address and click 'Add to Contacts'.

    • This will now be stored in the Unused Contacts Field

    • Repeat the process if you require more than one recipient

  • Now drag the email addresses into the 'To', 'CC' or 'BCC' boxes

  • Click Save in the Top Right Side of the Screen

Notes

Info

Recipients do not need to be registered Dashboard Users to be able to receive reports.

Info

All Report Times are sent at GMT.

Info

Annual Energy Report and Emergency Report recipients must be set up individually.

Report History

Whenever a one off or scheduled report is sent, it is stored in the Report History Screen and can be viewed or downloaded as an additional record.

Click Project Reports > Report History

...