Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Access point - Access point: LMS CONNECT RevPi Core3+ATLAS

  2. Local gateways to your systems:

    1. Ethernet2Dali (E2D) - LMS E2D VERTEX APC 3 (if you already have it in your installation, you don’t need to add another one) with internet connection

    2. Wireless Zigbee - LMS Zigbee Gateway

    3. DALI Complete - LMS CONNECT DALI/TCP GATEWAY

  3. 24 V power supply(s) - LMS CONNECT 24V 60W POWER

  4. Ethernet switch ports for all access points and gateways - you can use LMS E2D IND SWITCH.

  5. Internet connection - you can use LMS E2D REMOTE ACCESS KIT as a GSM gateway

...

  1. connection.

Note

Glamox Connect monitors luminaires as long as they are powered. If you use the manual power switch, the luminaires will be flagged as missing (Maintenance issue and alert). To avoid this, do NOT mount monitored equipment on a power line with "manual" power switch.

...